Proof of Service for Gritting Contracts: What to Record and Why

By The Field Forge Team7 min read

A slip on an icy car park in January can turn into a claim the following summer, or three years later. When it does, the first question is what was done on that night, and the best answer is a record made at the time.

This guide covers who owes the duty on a private site, why records matter when a claim comes in, how long to keep them, and what a useful gritting record shows. It is written for contractors who grit private sites such as car parks, retail parks, business parks and forecourts, and covers the law in England, Wales and Scotland. It is not legal advice.

Who owes the duty

The occupier. In England and Wales, the Occupiers' Liability Act 1957 requires an occupier to take such care as in all the circumstances is reasonable to see that a visitor will be reasonably safe in using the premises for the purposes for which they are invited or permitted to be there. The Act calls this the "common duty of care". A slip on ice on a private site is usually claimed under this duty, often alongside negligence. Under the 1957 Act, a warning, such as a sign or a cone, does not by itself discharge the duty unless, in all the circumstances, it was enough to enable the visitor to be reasonably safe.

In Scotland the Occupiers' Liability (Scotland) Act 1960 sets a similar duty, owed to anyone entering the premises.

The employer. Regulation 12 of the Workplace (Health, Safety and Welfare) Regulations 1992 requires every floor and traffic route in a workplace to be kept free, so far as is reasonably practicable, of anything that may cause a person to slip, trip or fall. A workplace includes the roads and paths used to get in and out of it, other than public roads, so an employer's own car park and access roads are covered. The Management of Health and Safety at Work Regulations 1999 require employers to assess risks, including slip risks such as ice, and employers with five or more employees must record the significant findings.

The highway authority, on public roads only. Highway authorities in England and Wales have a duty under section 41(1A) of the Highways Act 1980 to ensure, so far as is reasonably practicable, that safe passage along a highway is not endangered by snow or ice. In Scotland, section 34 of the Roads (Scotland) Act 1984 requires roads authorities to take such steps as they consider reasonable to prevent snow and ice endangering the safe passage of pedestrians and vehicles over public roads. Those duties cover highways maintainable at the public expense in England and Wales, and public roads in Scotland. They do not reach private car parks, forecourts or unadopted roads, which is where private gritting contracts come in.

What the law actually asks of a site owner

Two words carry the weight: "reasonable" and "circumstances". The duty is not a guarantee that nobody will ever slip. In Cook v Swansea City Council [2017] EWCA Civ 2142, a 78-year-old man slipped on ice in an unmanned council pay and display car park. The council only gritted its car parks when a member of the public reported a dangerous area. The judge found that a reactive system was "the only proportionate and reasonable way of dealing with the problem of ice in car parks", apart from exceptional heavy snowfall, and the Court of Appeal dismissed the appeal (Local Government Lawyer).

That might sound like good news for anyone who does not grit. It is not. The council in Cook could show what its system was and that there had been no previous reports or accidents at that car park (3PB, The Risk of Ice). The defence was the system and the evidence of it. And a business park with a reception, a known path and staff arriving at 8am is not an unmanned car park. An insurance law review that cites Cook also cites Murphy v Bradford MBC, where a council was liable because a steep, accident-prone path needed more effort, and McCondichie v Mains Medical Centre, where gritting the pedestrian routes was found reasonable and discharged the duty. For employers there is a further layer: in Kennedy v Cordia [2016] UKSC 6 an employer was liable for failing to assess a known winter risk to a home carer (Clyde & Co, Avoiding Winter Slip-ups).

If you get the Thursday call, speak to your insurer before you send anything.

Why records matter in a claim

Since 1 October 2013, a breach of health and safety regulations such as the Workplace Regulations is generally not actionable in civil proceedings on its own in Great Britain. Someone who slips has to prove negligence or a breach of the occupier's duty of care, although a breach of the regulations can still be evidence of negligence. That puts evidence of a reasonable system, and records of what was done under it, at the centre of most defences.

The highway rules show how this works. Under section 58 of the Highways Act 1980, a highway authority has a defence if it proves it took such care as was reasonably required. If it relied on a competent contractor, it must also prove it gave the contractor proper instructions and that the contractor carried them out. Section 58 does not apply to a private occupier, but the same two things help one: a record of what the contractor was asked to do, and proof that it was done.

Two more points matter to a contractor:

  • In England and Wales, an occupier is not automatically liable for a danger caused by an independent contractor's faulty construction, maintenance or repair work, if it acted reasonably in entrusting the work to the contractor and took such steps as it reasonably ought to satisfy itself that the contractor was competent and the work properly done (section 2(4)(b) of the 1957 Act). That is one reason clients ask their gritting contractor for evidence. It is not clear that gritting counts as maintenance work for this purpose.
  • A business contract, such as a gritting contract, cannot exclude or limit liability for death or personal injury caused by negligence (section 2(1) of the Unfair Contract Terms Act 1977, and section 16 for Scotland). That does not stop the client and the contractor agreeing between themselves who bears the risk, through indemnity and insurance clauses.

How long to keep records

In England and Wales, a personal injury claim must normally be started within three years of the accident, or of the date the injured person had the relevant knowledge if that is later, and the court can extend the time. A claim form issued at the deadline can still be served up to four months later. For a child, the three years do not start until they turn 18, so a slip suffered as a child can be claimed for up to their 21st birthday.

In Scotland the period is also three years, from the injury or, if later, from when the injured person knew, or could reasonably have known, the relevant facts. Time does not run while someone is under 16.

So keep gritting records for more than three years, and longer where children are likely to be, such as schools and retail parks. If your insurer or the contract asks for longer, keep them for that.

In England and Wales, a public liability injury claim worth up to £25,000, and above the small claims limit, starts through a pre-action portal, where the defendant's insurer has 40 business days to respond. Keep records where they can be found and sent to the client's insurer within days.

What a useful gritting record shows

We found no official guidance on what a private gritting contract or record must contain, so what follows is practice, not law. A record that can answer a claim usually shows:

  1. The forecast you relied on. Gritting decisions are made on road surface temperature forecasts, not air temperature: road surfaces lose heat faster at night, so frost can form on the road while the air is still above freezing. Keep the forecast itself, not a note of what it said: for example, the PDF from a commercial road weather service such as the Met Office's OpenSite.
  2. The decision for each site. Treat or not, and the reading behind it. A night you decided not to grit needs a record as much as a night you did.
  3. The treatment. Who treated the site, when they arrived, which areas they treated, and photos.
  4. What could not be treated, and what was done instead. Areas blocked by parked cars, routes closed off or people diverted, and where warning signs went.
  5. What the contract asked for. The trigger, the areas in scope and the response time agreed with the client, so the record can be read against them.

HSE's guidance is not law, but it shows what HSE expects of an employer. Its slips guidance says to:

  • identify the outdoor pedestrian areas most likely to be affected by ice, such as building entrances, car parks, walkways, shortcuts, slopes and areas that are always in shade or wet;
  • monitor temperatures and put a system in place to manage the risk;
  • grit when frost, ice or snow is forecast, or when walkways are likely to be damp or wet and floor temperatures are at or below freezing;
  • grit in the early evening, before the frost settles, or early in the morning, before people arrive, which it names as the best times;
  • where not every route can be treated, tell people which routes are prioritised, divert them away from icy routes or bar those off, and remove warning cones once the hazard has passed.

It also sets out salt's limits: it needs time to dissolve into the moisture on the surface, heavy rain can wash it away, compacted snow that has turned to ice is hard to treat, and dawn frost can form on dry surfaces.

What "reasonable steps" look like on the ground

The insurance review adds that "A delay in implementing suitable risk prevention and the time available to respond to events will be a factor" (Clyde & Co).

So the questions a solicitor will put to your client, and your client will put to you, are these:

  • What was the forecast for that site that night, and when was it looked at?
  • What is the trigger, and was it met?
  • Was the site treated? At what time? By whom?
  • Which areas were treated? Was the path by reception on the treatment map?
  • What was the site like when the operative left?
  • If the site was not treated, why not, and was the client told?

Each of those is a record. If it exists you send it on Friday. If it does not, your client is defending a claim with your word and a diary entry that says "gritting".

Gritting proof of service: what public sector clients already require

To see where commercial clients are heading, look at what councils and NHS trusts write into contracts. The Royal National Orthopaedic Hospital's gritting contract requires "reporting and site attendance records" (Find a Tender, notice 052679-2025). Bradford Council's winter service plan has GPS and spread-rate data reviewed daily and retained through the winter, a record sheet for every call-out, and forecasts, record sheets and any claims kept together at the depot (Bradford Council winter service plan). Procurement guidance for FM buyers lists "Service evidence and audit trails" among the terms to agree before signing, and names GPS verification and photographic proof of service as the tools to look for (OUTCO, procurement timeline). A winter maintenance audit trail is becoming the price of entry.

Plays from YouTube. YouTube may store data in your browser once you press play.

Winter Gritting Software for UK Contractors

Import the night’s road forecast and every zone’s temperature and colour band is read for you to check. Under the default rules, red and amber zones generate salting jobs. Engineers get tonight’s sites on their phone, with photo evidence wherever you require it, and Salting Runs keeps every run on record, gritted or not.

Start your free 30-day trial

Keeping the record in Field Forge

Field Forge's winter gritting and salting is built around that record:

  • Upload the nightly OpenSite road weather forecast PDF and Field Forge reads a temperature and colour state for each of your zones for you to check and correct before anything is applied. Each run records where each zone's reading came from: the forecast as read, the forecast as edited, or a reading typed in by hand.
  • One tap generates a gritting job for every site that triggers on the night's readings, and the run keeps each zone's reading and decision, including the zones you decided not to grit.
  • Engineers clock in on their phones with a geofenced arrival check, and each visit, or a month of visits, becomes a proof-of-service pack you can send to the client.

Sources

Related tool

Field Service Savings Calculator

Estimate your annual savings, payback period, and productivity gain from moving your team onto a modern field service platform. Three views, live results.

See your ROI

Newsletter

Get practical tips for running your contracting business

One email a week. No spam. Unsubscribe at any time.

We use your email only to send this newsletter, and you can unsubscribe at any time. See our Privacy Policy.

More from the blog

No card required

Start your 30-day free trial

Quote, schedule, and invoice from one platform. No sales call, no setup fee, no card needed.

30 days free · No credit card required · Cancel at any time